Highlights of the:  Salem Bike-Ped Corridor

Towns involved:  Methuen MA, Salem NH, Windham NH

Miles:  5.3

Trail Surface:

  • Paved 2.0 miles
  • Crushed gravel 2.0 miles
  • Packed dirt 1.3 miles

Difficulty:

  • Easy. smooth
  • Easy-moderate

The Complete Bodybuilding Diet and Nutrition Guide kai greene height bodybuilding pussys gay movies

Trail activities allowed:

  • Walking
  • Cycling
  • In-line skating
  • Dog walking
  • E-bikes (Class 1 & 2)
  • XC Skiing
  • Snowshoeing
  • Geocaching
  • Bird watching

Map:  See GSRT Google map; https://bit.ly/2YqZbpV

Parking:

Salem Depot municipal lot, Rt 28 trailside parking at Salem-Windham town line.  Ample parking for disabled trail users.

Amenities:

  • Information kiosk
  • Coffee shop
  • Restaurant
  • Bike shop
  • Bike repair station

Website:   www.fsbpc.org

Social media:  www.facebook.com/SalemNHBikePedCorridor

Comments:

Multiple granite benches, picnic tables, bike racks, and three historic markers.
The “cow tunnel” was restored as a Girl Scout project.

Contact:

Dave Topham   dstopham@comcast.net  603.898.9926

===============